Privatization of Lebuhraya Persisiran Pantai Barat (Taiping-Banting)

SECTION 11 : BERUAS INTERCHANGE TO TAIPING SOUTH INTERCHANGE

Section 11 of the West Coast Expressway is the last section of the WCE stretch. The section starts from Ch 99,400 after the proposed Beruas Interchange and ends at Ch 134,370 at Changkat Jering Toll Plaza. A 35 KM Dual 2-lane Carriageway of flexible pavement with Rest Service Areas on both bound, 2 Interchanges and 15 bridges. The Proposed highway transverse through high cut terrain involving 6 million cubic meter cut and 1 million cubic meter volume of rock cut.